Pump U900/90 for its direct purpose to pump coal slurry, called coal pumps, and is mainly used for hydro-transportation of coal and sludge in mines and concentrators. In addition, the coal mine U900/90 has found its widespread use in quarries, the metallurgical, mining and processing and cement industries, as well as in the transport of other bulk materials.
General characteristics:
Production
900
m³/h
Water column height
90
m
The Production of the dry residue (nominal)
135
m³/h
The Production of the dry residue (maximum)
300
m³/h
Power pump for pumping pulp
315
kW
Powerpoint
300
kW
Pulp transport length (nominal)
900
m
The depth of the development (minimum)
0,4
m
The depth of the development (maximum)
12
m
Diameter solids (max)
200
mm
Diameter pressurized slurry pipeline
250
mm
Area of use
River
Specifications:
The length of the dredger
13
m
The width of the dredge
2.4
m
Overall width with pontoons
8
m
The height of the dredger
4
m
Weight dredger
16
ton
Internal supply
12
V
Outdoor supply
12
V
Onboard power supply
12/24
V
Installed Hardware:
Engine 300 kW (specific consumption of diesel fuel 200 g/kWhh)
1
pcs
Pump U-900/90*
1
pcs
Active milling cutter (increased productivity for light soil)
1
pcs
Auxiliary pump (ejector) 33 m/cube per hour feed at a head of 70 m
1
pcs
Reversible propeller 35 kW (dredger drive drive)
2
pcs
Hydraulic motion control
1
pcs
Hydraulic cylinder lifting main suction pipe
2
pcs
Anchor piles (length 8 meters)
2
pcs
Fixing of the dredger at the work site of the anchor, hydraulic winches
3
pcs
Anchors
3
pcs
The drive of the main pump GRT 800/70 (hydraulic motor)
1
pcs
Drive of a milling cutter (hydraulic motor)
1
pcs
Floating slurry pipeline D-200 or 250 mm
100
m
Auxiliary crane-beam
1
pcs
Fuel tank 1000 liters
1
pcs
Technical water tank 500 liters
1
pcs
The battery (200 А/h)
2
pcs
Economic indicators
Provided that the length of the pipeline is 200 meters and the conventional geodetic lift is not more than 5 meters, this model nominally produces 135 cubic meters per hour or 1,350 cubic meters per 10 hours of operation. The density of sand is 1.3 tons per cubic meter, the weight of extracted sand is 1755 tons. The extraction costs of 1755 tons of sand will amount to 2,500 kWh in 10 hours. The nominal consumption of diesel fuel for 10 hours of operation is 2,500 kW x 0.200 l/kW = 500 liters. From this calculation, we conclude: To extract 1755 tons of sand, 500 liters of diesel fuel is needed. The cost of mining one ton of sand is 500 liters/1755 tons = 0.285 liters per ton.