General characteristics:
Production | 250 | m³/h |
Water column height | 30 | m |
The Production of the dry residue (nominal) | 37 | m³/h |
The Production of the dry residue (maximum) | 50 | m³/h |
Power pump for pumping pulp | 30 | kW |
Powerpoint | 40 | kW |
Pulp transport length (nominal) | 300 | m |
Pulp transport length (maximum) | 600 | m |
The depth of the development (minimum) | 0,2 | m |
The depth of the development (maximum) | 6,3 | m |
Diameter solids (maximum) | 25 | mm |
Diameter of suction pipe | 163 | mm |
Diameter pressurized slurry pipeline | 150 | mm |
Specifications:
The length of the dredger | 5 | m |
The width of the dredge | 2,2 | m |
Overall width with pontoons | 2,6 | m |
The height of the dredger | 2 | m |
Weight dredger | 2 | ton |
Onboard power supply, DC | 12/24 | V |
Deadweight | 6 | m³ |
Pantoons (performance polyethylene thickness 9 mm, filled with foam. Warranty period of operation 40 years) Approved by the Shipping Register of Ukraine
Installed Hardware:
Engine 40 kW (Weifang Marine Engine) | 1 | pcs |
Pump GrAT-250/30 | 1 | pcs |
Auxiliary pump (ejector) 5 m3/hour | 1 | pcs |
Winch lifting the main suction pipe | 1 | pcs |
Cutter (D350mm, 4 kW, 1000 rpm) | 1 | pcs |
Anchor Pile (length 7 m) | 1 | pcs |
Winches (Cable 8 mm, 150 meters) | 2 | pcs |
Fuel Tank 100 l. | 1 | pcs |
The battery (65 А/h) | 1 | pcs |
Economic indicators:
Provided that the length of the pipeline is 300 meters and the conventional geodetic lift is not more than 5 meters, this model nominally produces 30 m³/h or 370 m3 per 10 hours of operation. With a sand density of 1.4 tons per m³, the weight of the extracted sand will be 500 tons.
The energy consumption for extraction of 500 tons of sand will be 370 kWh per 10 hours. Nominal consumption of diesel fuel for 10 hours of operation 370 kWh x 0,210 l/kWh = 63 liters. From this calculation we conclude: To extract 500 tons of sand, should be used 63 liters of diesel fuel is needed. Fuel costs per ton of production of sand is 63 liters/500 tons = 0.1260 liters per ton.
Terms of delivery and cost
Cost EXW | $14.700 |
Production time | 1-2 months |
Prepayment | 70% |
Final payment upon completion of construction | 30% |
The price not includes Chief installation and commissioning
The dredger can be transported in one 40’ container.
1,571 total views, 1 views today